Concrete floor installation in Elko NV - a floor with the right barrier underneath
Old slab cracked and damp, or no floor at all? We pour a new concrete floor over a proper moisture barrier.

What goes into a new concrete floor in Elko?
Concrete floor installation in Elko means packing a solid base, laying a moisture barrier and pouring a concrete slab over it, so a basement, shop, addition or outbuilding gets a hard floor that keeps ground moisture away from whatever goes on top.
Maybe you've got a dirt floor in a shop, an old slab that's cracked and damp, or a new room that needs something solid underneath. The price mostly moves with the size of the floor, how much digging and base work it needs, whether an old slab has to come out first and how easy it is to get the concrete in, while the schedule turns on the weather and on any permit the job needs. If it's a garage, our garage floor concrete page covers that work, and for any floor I'll give you your own figure in the written estimate after I see the space.
How we handle concrete floor installation
I start by asking how you'll use the floor, because a shop with a truck parked on it and a storage room need different things. Our crew digs out the soft dirt and packs the subgrade, the layer the slab sits on, and we check where water runs so none of it ends up pooling under or against the floor. What goes under an indoor floor matters as much as the surface, so before the pour I go over the moisture barrier with you, then we set the forms and any rebar, the steel that helps hold the slab together. We pour outside the worst heat of the day, since concrete that sets too fast leaves a weak, dusty top, then we finish the surface and cut control joints, shallow grooves that give the slab a planned place to crack. After that comes curing, the wait while the concrete gains strength before you load it up.
A new floor often brings other work with it. If the floor sits above or below the doorway, concrete steps make the change in height easy to walk, and if you're planning the yard too, concrete pool decks get the same careful base work we put under a floor.
Permits and radon for concrete floors in Elko
The City of Elko Building Department is the permit contact in Elko, and whether your floor needs a permit is the city's call, so I look into it during the estimate. When a job calls for one, we pull it ourselves and keep you posted on where things stand with the office that covers your property. If you'd rather check on things yourself, owners who aren't licensed contractors get into the city's permit portal through Residential Access with their address and parcel number, and the permit desk is open 9 am to 4 pm, Monday to Friday, at (775) 777-7220.
A county radon map puts radon potential for the 89801 ZIP at 31.6%, and radon gets into houses through floor cracks, gaps around floor drains, joints and the openings where pipes and utilities come through. A new floor has every one of those, so on floors we pour around Elko and out in Spring Creek, we take our time fitting the barrier around pipes and drains and keep the joints where we planned them.
How a floor job works
Call or send the form
Call (775) 510-0139 or fill out the form and tell us a little about the space. We'll set a time for me to come out.
I look at the space
I come out, look at the site and ask how you'll use the floor. Then I write up an estimate that lays out the base work, the barrier and the price, so you know the cost before anything gets dug.
Sort out permits and pour date
Once you're ready, we sort out the permit side and set a pour date that suits the weather and the site. In the cold months that date moves with the forecast.
Pour, finish and hand over
Our crew pours the slab, finishes it and cuts the joints. Before we leave, we tell you how to care for the new concrete while it cures.

Get a free on-site estimate from Elko Concrete in Elko
We reply within one business day to set a time. I come out, look at the space, ask how you'll use it and write up a free estimate, and you're under no obligation to go ahead.
Questions before you book a concrete floor
How much does a concrete floor cost in Elko, NV?
An installed concrete slab across the US usually costs about $6 to $12 per square foot, and that's the general market range, not our price. Your own floor's figure comes from the estimate after I see the space, since base work and tear-out vary a lot from one floor to the next.
What is the best way to save money on a new concrete floor?
Save on the finish, not the base. The base is hidden on day one, so it's the first thing people want to trim, but a slab only stays put as long as what's under it does, and I've seen plenty sink because the dirt was raked level instead of dug out and packed. A plainer finish is easy to live with, and a sunken floor isn't.
How do I choose a vapor barrier for a concrete floor?
Ask every bidder which barrier they're putting under the slab, because a national concrete floor guide says plain polyethylene sheeting, though it was used in the past, falls short and shouldn't be considered for this. The same guide says a sheet sitting right against the slab gives floor coverings and coatings the most protection, so ask about that too. It's worth settling before the pour, since nobody's pulling that sheet back out afterward.
Can a concrete floor be poured in winter in Elko?
Yes, as long as the ground isn't frozen and the forecast shows no freeze for 48 hours after the pour, which is what a cold weather trade guide advises. Frozen ground swells, so a slab poured on it rests on false support and settles as the ground thaws. National guidance counts it as cold weather work once the air is at 40°F or expected to drop below it while the fresh concrete still needs protecting, so in Elko's cold months we pick the date by the forecast.
What causes cracks in a new concrete floor?
Concrete shrinks a little as it dries, so some cracking is normal, and a national floor guide says a floor that never cracks or curls up at the edges isn't realistic even with the best design and construction. That guide also says owners should hear this up front, which is why I tell you before we pour. What we can control is where the cracks go, so we lay out the joints to keep any cracking in neat, straight lines.
Do I need to keep the space open after the concrete floor is poured?
Yes, keep it clear for our crew for the rest of that day, because trade guidance says saw-cut joints go in within 4 to 12 hours after the concrete is finished. Cutting late is how cracks end up in places nobody chose, so we plan that window with you when we set the pour date.
Why Elko homeowners call Elko Concrete for concrete floors
I write every estimate myself
I come out to look at every job and write the estimate myself, and I'm on site with our crew while the floor goes in. You talk to one person about the barrier and the joints, and that person is there on pour day.
Years of fixing failed slabs first
We've been in business since 2023, and before that I spent years patching sunken slabs and cracked walks for a property management company. That's where I learned what makes concrete fail, and it's why we build to skip those mistakes the first time.
Fully licensed and insured in Nevada
Nevada's contractors board licenses concrete work as its own trade, and we're fully licensed and insured. It's worth asking every bidder about both before anyone starts digging in your space.
A floor is only as good as what's under it, so call or send us the form and I'll come take a look at yours.
Other concrete work that goes with a new floor
Concrete pool decks
A pool deck takes splashing water and bare feet all summer, so it needs a sound base and a textured top that gives some grip when it's wet.
Concrete steps construction
Steps poured to a comfortable height make getting in and out of a new room or shop easier, especially when your arms are full.
Plan your concrete floor and steps with us
Call (775) 510-0139 or send the form while you're still deciding, because the barrier and the joint layout are easiest to talk through before anything gets dug.