Elko ConcreteElko Concrete

Concrete pool decks in Elko NV - a deck with good grip that drains water away

If your pool deck is cracked, slick when wet or pooling water, we pour a new one with real grip, sound drainage and a proper gap at the coping.

Concrete pool deck with a light gray, jointed surface beside a curved turquoise pool, lounge chairs, trees, and a wooden fence.

What does a new concrete pool deck in Elko involve?

A concrete pool deck is the slab around your pool that everyone crosses wet and barefoot, and in Elko we build ours so it grips underfoot, drains away from the house and leaves the pool edge room to move.

Most folks call me when the old deck has gone slick, cracked along the coping or started holding puddles by the back door, and they want to know if a new one will just do the same thing. The price mostly follows the size of the deck, whether an old slab has to come out first, how much digging and drainage work the yard needs and which finish you pick, while the schedule turns on the permit side and on picking a pour date that suits the weather. You'll get your own number in the written estimate once I've walked the yard with you, and if you want a pattern or color, our decorative concrete work can go into the plan too.

How we build a concrete pool deck

Around a pool I think about wet bare feet and where the water runs first, and about looks after that, so every job starts with a plan before anybody digs. We work out where the coping, skimmers, drains, equipment pad, pipes and movement joints sit before the forms go in, because fixing that after the pour means breaking out new concrete. Then we dig out and pack the subgrade, the ground the slab sits on, set the slope so water heads away from the house without washing dirt into the pool, place the rebar, the steel that keeps the slab tied together, and pour early in the day so the top doesn't bake weak and dusty in the midday heat. Along the pool edge we leave a gap that gets filled later with flexible sealant, because one coping maker's guide points out that a deck moves with heat, settling and freeze-thaw, and with no gap that movement can crack the coping and the bond beam, the reinforced band at the top of the pool wall. If the budget gets tight, I'd rather you go simpler on the finish than skimp on the base, because nobody sees a good base on day one but everybody sees a bad one once the slab starts settling with the dirt under it.

Pool decks rarely stand alone. The back door usually sits above the deck, so we often build concrete steps down to it at the same time and match the finish, and if you're adding a pool house or an equipment shed, our slab foundation building gives it a solid floor on the same careful prep.

Pool decks, permits and backyard work around Elko

In Elko, permits go through the City of Elko Building Department, and whether your deck needs one is something I check during the estimate instead of guessing. If you're not a licensed contractor, the city gives you permit access through Residential Access using your address and parcel number, but when a job calls for a permit we pull it ourselves and keep you posted on where things stand with the office that covers your property.

Most of the pool decks I look at in Elko and out in Spring Creek are backyard slabs tied into a patio or the back steps, so we plan the whole run of concrete together and build it the same way in both places.

How a pool deck job goes

  1. Call or send the form

    Call (775) 510-0139 or send the form and we'll set a time for me to come out. A few words about the pool and the old deck help me know what I'm walking into.

  2. I walk the yard with you

    I look at the slope, the coping and the old slab, ask how you use the pool and check whether the job needs a permit. You get a written estimate that lays out the finish, the drainage plan, the base work and the price, so there are no surprises later.

  3. Set a pour date

    Once you're ready we handle the permit side and pick a pour date that suits the conditions. Fresh outdoor concrete needs time to cure, the wait while it gains strength, before hard freezes come, so I won't push a pour that leaves the deck short on that time.

  4. Pour, finish and hand off

    We pour, finish and cut the joints, then clean up and tape the deck off while it cures. Before we go, I walk you through how to care for the new concrete and when the coping joint gets sealed.

Stamped concrete pool deck with a mottled brown finish beside a blue swimming pool and orange chairs.

Get a free on-site estimate for your pool deck and steps

We reply within 1 business day, and the estimate is free, done at your property and comes with no obligation. After you send the form, we set a time, I come out to look at your yard and ask how you use the pool, and you get a written estimate to think over at your own pace.

Call (775) 510-0139

Questions before you book a concrete pool deck

How much does a concrete pool deck cost in Elko?

The cost comes down to the deck's size, whether an old deck has to be broken out and hauled off, how much digging, base and drainage work the yard needs and the finish you choose. A plain broom finish usually costs less than exposed aggregate, coatings or decorative work, and extras like added drains or steps raise the total. I put your number in writing after I've seen the site.

Which finish works best around a pool?

A finish with good grip for wet bare feet works best, which is why a broom finish, a light texture dragged across the fresh surface, is such a common pick. Textured, exposed aggregate, coatings, overlays and decorative finishes all differ in traction and in how hot they get, and very dark finishes can get uncomfortable in the sun. I'd weigh grip first and color second.

What causes cracks in a pool deck, and will my new one crack?

Your new deck will likely get some cracks, because flatwork, the flat slabs like decks, walks and patios, shrinks as it dries and moves with temperature. That's why we cut control joints, shallow grooves that give the slab a planned place to crack, and cut them on time, since late or skipped joints leave cracks wherever they please. Judge a deck by whether its cracks stay in the joints.

How often does the joint at the pool coping need care?

About once a year, according to one coping maker's guide, which says to look the joint over every year and redo the caulk when it cracks, pulls away or wears thin. That guide says most elastomeric caulks, the flexible kind used in that gap, last five to ten years. It also advises waiting at least 30 days after the pour before caulking, so the concrete can do its first curing and shrinking.

How do I reach the City of Elko Building Department about a permit?

Call the department at (775) 777-7220 or email Permits@elkocitynv.gov, and its staff can help with your questions. The permit office is at 1751 College Avenue and is open 9 am to 4 pm, Monday through Friday. On the decks we build, owners rarely need to call, since we take care of the permit side.

What is the best way to care for a new concrete pool deck?

Keep deicing salts and chemicals off it, even once the surface looks hard, because new concrete is still developing underneath. Follow the care notes we leave you, and feel free to ask me how the job follows the concrete supplier's guidance on cold-weather protection and the first use of your deck.

Why Elko homeowners call Elko Concrete for pool decks

  • I write every estimate myself

    I come out to look at every job and write the estimate myself, and I'm on site with our crew while the work gets done. The person who told you how the slope and the coping gap would go is the one standing there when they're built.

  • Learned from fixing failed concrete

    Before I started Elko Concrete in 2023, I spent years doing upkeep for a property management company, patching cracked walks, broken steps and sunken slabs. Three years in, that's still why the base and the drainage get as much of our attention as the finish on top.

  • Licensed and insured in Nevada

    Concrete contracting is a trade licensed by the Nevada State Contractors Board, and Elko Concrete is fully licensed and insured. It's worth asking any crew about before they start digging next to your pool.

On a pool deck, the parts you'll care about years from now are the ones buried on day one, the packed base, the slope and the gap at the coping. Get in touch and I'll come take a look at yours.

  • Concrete steps construction

    Crumbling or uneven steps between the house and the deck are an easy place for wet feet to slip, so replacing them while we're already set up makes sense.

  • Slab foundation building

    A pool house or changing room beside the deck needs a level slab on packed ground, and pouring it during the same project keeps both surfaces lined up.

Talk through your pool deck and steps

Call (775) 510-0139, email team@elkoconcrete.com or send the form, and have your property address and parcel number handy, since the city uses both when a permit is needed.

Stamped concrete pool deck surrounds a curved swimming pool, with a covered stone pavilion and green lawn beyond.
(775) 510-0139Request a consultation